With the future expansion load, it is recommended to select the 6 Space, 12 Circuits subpanel for 60A designed for 8.5kW load points. In this case, the minimum 4-Space, 8 Circuits main lug is needed. ![]() total 4 spaces will be occupied by these breakers. There are a total 3 breakers (1 x Single Pole & 1 x Tow-Poles) are needed in the given example i.e.